Use instead the Route Optimisation tool

of our AdvancedFleet Telematics suite.

Stonea Road Bridge was hit 33 times this year up to March 2022!

Network Rail reveals Britain’s most bashed bridges and urge fleet operators to wise up to avoid £‘000 of damages and numerous train delays.

Our route optimisation tool will ensure you do not get stuck as well as provide you a way to operate your fleet as effectively as possible.

 

click  for more details

or contact us at 0208 391 8360

Source: https://www.fleetnews.co.uk/news/fleet-industry-news/2022/11/16/most-bashed-bridge-in-britain-struck-33-times?utm_source=aimtell&utm_medium=push&utm_campaign=campaign-5115957