In it’s inception DVS 2024 was to be enforced from 28th October 2024, with a grace period to allow operators time to fit a PSS until January 2025.

This grace period was to be made available to operators – ON APPLICATION – and was not automatic. Applications for the grace period required operators to make a specific application via their London Road User Charging account supplying:

Evidence that you had installation works arranged to fit the Progressive Safe System after 28 October 2024 was required.

A separate application was required for EACH VEHICLE operators wished to receive a grace period for.

As of July 2024 the length of this grace period was extended to 4th May 2025. An extension of the grace period by 3 months. The same conditions regarding APPLICATION for this extension apply.

Applications for the grace period are no longer available as of 28th October 2024. From this day DVS 2024 new regulations are enforced.